The major widening project of the Panama Canal (5.4 billion US$) commenced in 2008 and is expected to be completed in 2015. This would enable larger vessels to transit the canal, up to three times size. The Panama Canal Authority has come up with requirements for the vessels to transit the canal. This paper outlines the need and the process for undertaking such modification and preparing the booklet for submission and approval prior vessel calling.
The major impact on the widened canal will be in the container segment where the widening can help most of the vessels to transit.
Procedure
The dimension limitation of the old and new Panamax vessel is shown below.
PROCESS
The first step then is to identify the additional requirements to meet compliance. The list of requirements are as follows:
1. Pilot Platforms and Shelters
Pilot platform and shelters with dimensions 1.5 x 1.5 area and headroom of 2.1/2.25 m to be provided on bridge wings.
2. Protrusion
Protrusions – cargo or extensions beyond the ship’s side located 16.4 m or less above the waterline is not permitted.
3. Visibility requirements
The requirement are clearly spelt out in the rules – 1 ship length in loaded and 1.5 ship length in ballast condition for all vessels. For container vessels this is 2 ship lengths or 500 m, whichever is lesser.
3. Mooring Arrangements
The requirements for bollards and chocks are specified based on the vessels size. Chocks that are specified as single chock shall have SWL of 45.36 T and double chocks shall have SWL of 64 T.
For a vessel that is over 173.74 m length or 22.86 m width, the following chocks are required:
- Bow centerline (double), stern centreline (double)
- Two double (of centreline not provided)
- Set 1 (Double 12-16 m abaft of stem)
- Set 2 (Single 24-28 m abaft of stem)
- Set 3 (Single 24-28 m forward of stern)
- Set 4 (Double 12-16 m forward of stern)
4. Mooring Lines, Anchor
Vessels are required to have on deck six manila or synthetic mooring lines forward and six aft in good conditions. Each line shall be 75 meters in length and have an eye of 1.5 meters spliced in one end.
Mooring winches shall be capable of retrieving the lines at 37 meters per minute. Anchors shall be retrieved at rate of 9 meters per minute.
5. Wheelhouse
The wheelhouse and bridge wings are required to have a list of equipments and facilities like clear safety glass, rudder angle indicators, rpm indicator, VHF trans-receiver. Most of these requirements would be met, except some of the devices not being there in bridge wing.
6. Vessel Section
The section of the vessel in the canal with all clearance need to be made for all locks.
Experience: One 4,700 TEU with additional chocks and bollards approval from class completed.